No Package Name LOA Date
Contractor
PART A : ADVANCE WORKS
1 AW2 - Package C1
Construction and completion of working platform including Earthworks, Access Road, Drainage Works,TNB Substation, Retaining Walls, Utilities Protection and Ancillary Works for Semantan launching shaft
03/06/2011 Menta Construction Sdn Bhd
2 AW5 - Package D2
Relocation of existing sewerage and water mains for Cochrane launching shaft
24/06/2011 Puncak Niaga (M) Sdn Bhd
3 AW12 - Package SYB1
Relocation of existing water pipe line and traffic management for utilities relocation for KL Sentral
31/1/2012 Hatimuda Sdn Bhd
4 AW13 - Package TEL1
The relocation of existing telecommunication lines for KL Sentral
14/12/2011 Sri Communication Sdn Bhd
5 AW14 - Package TCO1
The relocation of existing fibre optic lines for KL Sentral
14/12/2011 Tenaga Nirwana (M) Sdn Bhd
6 AW15 - Package TNB1
The relocation of existing power supply cables for KL Sentral and Merdeka
14/12/2011 Worktime Engineering Sdn Bhd
7 AW16 - Package TEL2
The relocation of existing telecommunication lines for Merdeka
14/12/2011 Sri Communication Sdn Bhd
8 AW18 - Package TEL3
Relocation of existing telecommunication lines for Maluri
19/1/2012 Sri Communication Sdn Bhd
9 AW19 - Package TCO2
Relocation of existing fibre optic lines for Maluri
19/1/2012 Fastpro Sdn Bhd
10 AW20 - Package TNB2
Relocation of existing power supply cables for Maluri
6/3/2012 Huls Transmission Sdn Bhd
PART B : VIADUCT GUIDEWAY
11 Elevated Section V1 - Viaduct
Construction and completion of viaduct guideway and other associated works from Sungai Buloh to Kota Damansara Station
18/5/2012 Syarikat Muhibah & Perniagaan & Pembinaan Sdn Bhd
12 Elevated Section V6 - Viaduct
Construction and completion of viaduct guideway and other associated works from Plaza Phoenix station to Bandar Tun Hussein Onn Station
16/2/2012 Ahmad Zaki Sdn Bhd
13 Elevated Section V7 - Viaduct
Construction and completion of viaduct guideway and other associated works from Bandar Tun Hussein Onn to Taman Mesra
18/5/2012 MTD Construction Sdn Bhd
14 Elevated Section V8 - Viaduct
Construction and completion of viaduct guideway and other associated works from Taman Mesra to Kajang Station
26/9/2012 UEM Construction Sdn Bhd
PART C : DEPOTS
15 Package Dpt1: Construction And Completion Of Sungai Buloh Maintenance Depot, Administration Building, External Works And Other Associated Works 18/5/2012 Trans Resources Corporation Sdn Bhd
16 Package Dpt2: Construction And Completion Of Kajang Maintenance Depot, External Works And Other Associated Works 24/7/2012 TSR Bina Sdn Bhd
PART D : UNDERGROUND WORKS
17 Underground works (Tunnel stations & associated structures) between Semantan north portal and Maluri south portal 30/3/2012 MMC Gamuda KVpokerstars home games mobile ios (T) Sdn Bhd
PART E : MULTISTOREY PARK & RIDE
18 Package MSPR1 : Construction And Completion Of Multi Storey Car Park Building, External Works And Other Associated Works At Sungai Buloh Station 24/7/2012 TSR Bina Sdn Bhd
19 Package MSPR9 : Construction And Completion Of Multi Storey Car Park Building, External Works And Other Associated Works at Kajang Station 18/3/2013 SMPP-IBWANI JOINT VENTURE
20 Package MSPR4 : Construction And Completion Of Multi Storey Car Park Building, External Works And Other Associated Works at Section 16 Station 30/6/2014 Budaya Restu Sdn Bhd
21 Package MSPR6 : Construction And Completion Of Multi Storey Car Park Building, External Works And Other Associated Works At Taman Bukit Mewah Station 30/6/2014 Perkasa Sutera Sdn Bhd
22 Package MSPR8 : Construction and Completion of Multi Storey Car Park Building, External Works And Other Associated Works At Taman Koperasi Station  30/6/2014 InnoSeven Sdn Bhd
23 Package MSPR11 : Construction And Completion Of Multi Storey Car Park Building, External Works And Other Associated Works At  Saujana Impian Station 30/6/2014 RD Resources Sdn Bhd
PART F : ELEVATED STATIONS
24 Package S1: Construction And Completion Of Elevated Stations And Other Associated Works At Sungai Buloh, Kg. Baru Sungai Buloh And Kota Damansara 28/8/2012 Trans Resources Corporation Sdn Bhd
25 Package S2 : Construction And Completion Of Elevated Stations And Other Associated Works At Taman Industrial Sungai Buloh, PJU 5 And Dataran Sunway 03/10/2012 Naim Engineering Sdn Bhd
26 Package S3 : Construction And Completion Of Elevated Stations And Other Associated Works At The Curve, One Utama And Taman Tun Dr Ismail 03/10/2012 UEM Construction Sdn Bhd
27 Package S4 : Construction And Completion Of Elevated Stations And Other Associated Works At Section 16, Bandar Damansara And Semantan 07/9/2012 Naim Engineering Sdn Bhd
28 Package S6 : Construction And Completion Of Elevated Stations And Other Associated Works At Taman Suntex, Taman Cuepacs And Bandar Tun Hussein Onn 28/8/2012 Ahmad Zaki Sdn Bhd
29 Package S7 : Construction And Completion Of Elevated Stations And Other Associated Works At Balakong And Taman Koperasi 28/8/2012 Apex Communication Sdn Bhd
30 Package S8: Construction And Completion Of Elevated Stations And Other Associated Works At Saujana Impian, Bandar Kajang And Kajang 03/10/2012 Apex Communication Sdn Bhd
PART G : CIVIL & STRUCTURAL AND OTHER WORKS
31 Package ECS1: Supply, Procurement, Installation, Testing And Commissioning Of Environmental Control System For Elevated Package V1 To V4 And Sungai Buloh Depot 18/3/2013 Kejuruteraan Astra Sdn Bhd
32 Package ECS2: Supply, Procurement, Installation, Testing And Commissioning Of Environmental Control System For Elevated Package V5 To V8 And Kajang Depot 18/3/2013 FastColl Corporation Sdn Bhd
33 Package FD3: Supply, Procurement, Installation, Testing And Commissioning Of Fire Detection and Protection System For Elevated Package V5 To V6 18/3/2013 Zulfan (M) Sdn Bhd
34 Package SDDT-E: Supply, Delivery And Supervision Of Installation, Testing And Commissioning Of Step Down Distribution Transformer For All Elevated Packages, Sungai Buloh and Kajang Depot 18/3/2013 PTIS Engineering Sdn Bhd
35 Package UPS-E: Supply, Delivery And Supervision Of Installation, Testing And Commissioning Of Uninterruptible Power Supply For All Elevated Stations 18/3/2013 Info-Matic Power Sdn Bhd
36 Package LED-E: Design, Supply, Procurement, Installation, Testing and Commissioning Of LED Lighting and Lighting Boom Equipment for All Elevated Packages 20/12/13 Norangkasa Enterprise Sdn Bhd
37 Package SDDT-U : Supply, Delivery, Installation, Testing and Commissioning of Lift System for All Underground Stations and Ancillary Buildings 26/6/2014 PTIS Engineering Sdn Bhd
38 Package UPS-U : Supply, Delivery And Supervision Of Installation, Testing And Commissioning Of Uninterruptible Power Supply For All Underground Stations and Ancillary Buildings 13/11/2014 Info-Matic Power Sdn Bhd
PART H : NON CIVIL WORKS/SYSTEM PACKAGES
39 Package SBK-S-12: Engineering, Procurement, Construction, Testing & Commissioning of Government Integrated Radio Network 4/6/2014 Sapura Research Sdn Bhd

Kindly email your queries to  should you need any further information

NoPackage NameLOA Date
Contractor
PART A - ADVANCE WORKS / ELEVATED
1AW201
Advance Works Package 1: Design & Build Of Installation, Testing And Commissioning Of TNB Pylon And Overhead Transmission Line Relocation.
23-Nov-15P.E.S.B. Engineering Sdn Bhd
2AW202
Advance Works Package 2: Design & Build Of Installation, Testing And Commissioning Of TNB Pylon And Overhead Transmission Line Relocation .
23-Nov-15Huls Transmission Sdn Bhd
3SBPQ
Proposed Design & Build of 17-Storey Police Quarters Consisting of 136 Units Class F Quarters Complete with Facilities and 6-Storey Carpark Podium on Lot 46 and Lot 47, Jalan Suasa 2, Mukim Petaling, Pekan Sungai Besi, Kuala Lumpur for The Development Of The Existing Sungai Besi Police Quarters
15-Jul-16S.N. Akmida Holdings Sdn Bhd
PART B - ADVANCE WORKS / UNDERGROUND
4JKR CSL
Sign & Build of New JKR Wilayah Persekutuan Workshop Including Automotive and Heavy Machinery Workshop & Associated Buildings at Lot 1571, Jalan 6/19 Cheras Together With “Taska”, Tennis Court & Access Road Development at Existing JKR Wilayah Persekutuan Chan Sow Lin Vicinity.
02-Feb-16Acre Works Sdn Bhd
5Kraf / C
Design & Build Of New Double Storey Structure For Cafeteria And ‘Preka’ Centre At Craft Complex Kuala Lumpur, Jalan Conlay.
14-Mar-16M.O. Jaya Sdn Bhd
PART C - UNDERGROUND WORKS
6UNGW
Construction And Completion Of Tunnels, Stations And Associated Structures from Jalan Ipoh North Escape Shaft to Desa Waterpark South Portal
31-Mar-16MMC Gamuda KVpokerstars home games mobile ios (T) Sdn Bhd
PART D - CIVIL & INFRASTRUCTURE / VIADUCT
7V202
Construction and Completion of Viaduct Guideway and Other Associated Works from Persiaran Dagang to Jinjang.
04-Apr-16Ahmad Zaki Sdn Bhd
8V210
Construction and Completion of Viaduct Guideway and Other Associated Works From Persiaran APEC to Putrajaya Sentral
19-May-16Malaysian Resources Corporation Berhad
9V208
Construction and Completion of Viaduct Guideway and Other Associated Works from Taman Pinggiran Putra to Persiaran Alpina.
17-Nov-16MTD Construction Sdn Bhd
10V209
Construction and Completion of Viaduct Guideway and Other Associated Works from Persiaran Alpinia to Persiaran Apec.
10-Mar-17Acre Works Sdn Bhd
PART E - CIVIL & INFRASTRUCTURE / DEPOT WORKS
11DPT203
Construction and Completion of Earthworks and Other Associated Works for Serdang Depot
05-May-16TSR Bina Sdn Bhd
12DPT201
Construction and Completion of Serdang Maintenance Depot, External Works and Other Associated Works.
12-Sep-17Consortium KKM - TRC
(Konsortium Kontraktor Melayu Sdn Bhd - Trans Resources Corporation Sdn Bhd)
PART F - STATION (Nominated Sub Contractor - NSC)
13S202
Construction and Completion of Elevated Stations and Other Associated Works at Kepong Sentral, Metro Prima, Kepong Baru and Jinjang.
21-Dec-16S.N. Akmida Holdings Sdn Bhd
14S205
Construction and Completion of Elevated Stations and Other Associated Works at Sungai Besi and Serdang Raya (North).
12-Oct-17Apex Communications Sdn Bhd
15S206
Construction and Completion of Elevated Stations and Other Associated Works at Serdang Raya (South), Seri Kembangan and UPM.
12-Oct-17Ahmad Zaki Sdn Bhd
16S208
Construction and Completion of Elevated Stations and Other Associated Works at Equine Park and Taman Putra Permai.
19-Sep-17S.N. Akmida Holdings Sdn Bhd
17S209
Construction and Completion of Elevated Stations and Other Associated Works at 16 Sierra and Cyberjaya North.
12-Oct-17Acre Works Sdn Bhd
18S210
Construction and Completion of Elevated Stations and Other Associated Works at Cyberjaya City Centre and Putrajaya Sentral.
15-Sep-17Malaysian Resources Corporation Berhad
PART G - DESIGNATED SUPPLIER (DS)
19SBG202
Supply and Delivery of Segmental Box Girders (SBG) (Packages V206 to V210)
25-Mar-16Acre Works Sdn Bhd
20UPS201
Design, Supply, Delivery, Supervision Of Installation, Testing And Commissioning Of Uninterruptible Power Supply For Elevated Stations.
(Package: V201, V202 & Part V203)
09-Jan-19Itmax System Sdn Bhd
21AEC201
Design, Supply, Installation, Testing & Commissioning Of Electronic Access Control System
15-Dec-17Apex-Johnson Controls Consortium
22UPS202
Design, Supply, Delivery, Supervision Of Installation, Testing And Commissioning Of Uninterruptible Power Supply For Elevated Stations And Depot
(Package: Part V203, V204 To V210 And DPT201)
31-Dec-18CSPM Resources Sdn Bhd -
CSPM Sdn Bhd Consortium
23LED201
Design, Supply, Procurement, Installation, Testing and Commissioning of LED Lighting for Elevated Stations (Packages V201 to V203)
15-Dec-17Norangkasa Enterprise Sdn Bhd
24LED202
Design, Supply, Procurement, Installation, Testing and Commissioning of LED Lighting for Elevated Stations (Packages V204 to V206)
28-Mar-18Itmax System Sdn Bhd
25LED203
Design, Supply, Procurement, Installation, Testing and Commissioning of LED Lighting for Elevated Stations (Packages V208 to V210)
28-Mar-18S.A. Continental JV Hexachamp Sdn Bhd
(S.A. Continental Sdn Bhd - Hexachamp Sdn Bhd)